![]() ![]() Section 5: OPA Board Subject: ARC/ECC Nonsense Msg# 1230655
|
||||||
Here are the proposed revisions to the ARC Guidelines. There was already a first reading. How many association members do you think know the rather substantial proposed changes?
Some appear to look beneficial. Deciding what are and what may need changes or elimination is no simple task. For example, one potential change all association members should be happy to see is that prior approvals of permits for parking RVs and travel trailers will be void when the original owner sells. I suspect we may have Bruce Bright to thank for that. A lot of work went into this. Doesn't mean it is perfect, or even close to perfect. The first board review was rubber-stamped. Link Below:
|
||||||
|
||||||
For reference, the above message is a reply to a message where: Major revisions to the Guidelines are in the works. I will upload a copy of the proposed changes shortly. A number of them are for the better, but some wording remains questionable in a few areas. The board needs to carefully study the changes, discuss them at length, and absolutely avoid rubber-stamping the proposed changes. The ARC committee members are volunteers who are devoting time and energy to this project. However, these Guidelines are super important and impact EVERY association member. Guidelines approvals have been rubber-stamped by boards in the past. That has to stop. Even board members are volunteers, but that in no way diminishes their responsibility to the association members they asked to elect them. |
Calendar |
![]() 8/5/2025 - 6:00 P.M. |
![]() 8/9/2025 - 9:00 A.M. |