![]() ![]() Section 5: OPA Board Subject: OPA Public Hearing Msg# 1226728
|
||||||
The existing fire station is functional and operating well.
Based on your perception or based on factual information from the OPVFD? |
||||||
|
||||||
For reference, the above message is a reply to a message where: Joe: I haven’t seen, heard or read nearly enough on the referendum to make an educated decision. Plans, specifications and material take offs are not even available. However, I have reviewed the structural engineering report, and I think “needed” is a little strong and should be “wanted”. The existing fire station is functional and operating well. If every building is to be made to comply with the ADA code almost every building over 40 years old will need to be torn down and rebuilt. I hope this isn’t about “want”. Marty |
Calendar |
![]() 6/28/2025 - 9:00 A.M. |
![]() 7/26/2025 - 9:00 A.M. |
![]() 8/9/2025 - 9:00 A.M. |