I incorrectly used the non-bullhead waterfront. Sorry for the confusion.
Shows $875 for interior lots, but another link shows $850. The point of my post remans the same - bulkhead repairs are going through the roof and we have a single contractor. Unfortunately, that may well be our only viable solution. |
||||||
|
||||||
For reference, the above message is a reply to a message where: For the current fiscal year budget, my non-water assessment was set at $850. Per the next fiscal year budget document, OPA is expecting a current fiscal year operational positive variance to budget of $646,000. When I divided the $646,000 positive variance by 8,500 lots, it looks to me like OPA collected $76 more from me than it needed. Put another way, OPA could have set my current year non-water assessment at $774. I'm still confused on the $965 figure and what it represents. |