![]() ![]() Section 23: OPA Elections Subject: Brett Hill Candidate Statement Msg# 952071
|
||||||
Colby,
I was referring to how the exterior of the wall was left unfinished, but the faux stone was applied to the inside only. The inside looks awesome, but from the outside, it looks unfinished when you see the great inside surface, and untreated cement on the outside. Brett Image below from Brett Hill - Image Title: BC Pool Inside |
||||||
|
||||||
For reference, the above message is a reply to a message where: Mr. Douty, The fence around the pool was completed last summer. It took longer than planned as we decided the space needed to be bigger to accommodate the 20 thousand plus visitors a summer, pushing the completion to end of June 2015. The finishing touches of the faux stone was completed after last summer, prior to this one, on the outside wall. Hope this clarifies for you. Have be a nice day, Colby |